INTEK Heat Insulation Paint
Product Description:
- INTEK PAINT is water base one component heat insulation paint that produced by special materials and unique technology. It obviously has the heat insulating result by reduce 10– 26°C on surface when temperature at above 60°C, the more heater weather the more different temperature between internal and external, energy saving. Making your building cooler in the summer or hot sunny weather.
- Good adhesion, can apply on many type of surfaces such as tole, concrete, roof tile.
- For hot sunny weather, if use INTEK Heat Insulation you save energy and increase production.
- Protection tole, reduce noise when it heavily rains..
Intended Uses:
- Apply on surfaces need to reduce heat from the sun like tole, roof tile, wall of factory,
school, hotel, hospital, shop, store, house, and farm.
Reference Figures:
|
|
INTEK Heat Insulation Paint is product of ABS International Paint JSC.
Product conforms to the standards: TCVN 8652:2012
Logo printed on pails
Nạtional Office of intellectual Property of Vietnam issued Number: 230452
INTEK Heat Insulation Paint
Instruction:
1. Surface Preparation:
- All surfaces to be coated should be clean, dry, free contamination.
- Aged coatings, rusty surfaces should be removed, treated clean before application..
- Concrete wall: cracks and defects should be treated before application...
2. Application:
- Old, rusty tole surfaces: Recommend to use INTEK Anti-rust Primer or INTEK Multi-functions Primer.
- New tole surfaces: Apply 2 – 3 layers of INTEK Heat Insulation at 0.25mm – 0.35mm, over coating interval at about 2h up to weather condition. First layer should be applied thin to protect not to be cracked, pill off. In case thick paint, difficult to apply; dilute 5% of clean water. First coating should be painted lightly, thus can achieve the better adhesion result of the coating. It may be painted thin or diluted with clean water, the amount of adding water will depend on the water absorbent of material.
CONSTRUCTION RECOMMENDATIONS
Air humidity: do not apply when humidity is above 85%.
Ambient temperature: Do not apply when the temperature is below 5°C or above 45°C.
Surface temperature: Minimum 3°C above dew point temperature. Too high temperature can damage the paint film, so construction conditions need to be adjusted when the temperature is above 50°C, such as changing working time, shielding, etc.
Limit contamination from dust... Stop applying it rains, snow, fog, strong winds, to avoid damage or destruction of the paint film and paint loss.
Actual coverage may depend on shape, size, surface condition of base material, weather, application method and other factors.
The product can only be used and applied by trained professional workers.
Storage: 24 months at 23°C, check product after this time. Store in a covered, dry place, away from heat and sparks. The shelf life may be shorter when the temperature is above 23°C.
CONSTRUCTION RECOMMENDATIONS
Air humidity: do not apply when humidity is above 85%.
Ambient temperature: Do not apply when the temperature is below 5°C or above 45°C.
Surface temperature: Minimum 3°C above dew point temperature. Too high temperature can damage the paint film, so construction conditions need to be adjusted when the temperature is above 50°C, such as changing working time, shielding, etc.
Limit contamination from dust... Stop applying it rains, snow, fog, strong winds, to avoid damage or destruction of the paint film and paint loss.
Actual coverage may depend on shape, size, surface condition of base material, weather, application method and other factors.
The product can only be used and applied by trained professional workers.
Storage: 24 months at 23°C, check product after this time. Store in a covered, dry place, away from heat and sparks. The shelf life may be shorter when the temperature is above 23°C.